Injection molding

PROJECT REQUIREMENTS

  • minimal real-estate occupation
  • picking two work pieces in one cycle from the injection press
  • palletization of work pieces on a pallet
  • automatic pallet preparation
  • ensure continuous operation of the cell without downtime during pickup of full pallets
  • possibility of choosing the quantity of products on the pallet

SOLUTION

  • designing the arrangement of the robot cell for minimal real estate occupation
  • making a special robotic gripper for handling two workpieces pieces in one cycle
  • conveyor system with automatic pallet dispenser
  • a safety system with light curtains that ensures uninterrupted operation of the robot
  • advanced cell management system with extensive configuration options
  • SIEMENS Safety PLC
  • SIEMENS HMI